...Build Together

With Us....

Projects

No Title Amount (RM)
1

Candangan membina blok baru sekolah jenis kebangsaan tamil (sjkt) lading jeram indera kota, kuantan

10,885,000.00
2

Project Mass Rapid Transit Lembah Kelang – Jajaran Sungai Buloh – Kajang
The construction and completion of RC structural works, including waterproofing work and adit connection to tunnel at escape shaft 3, kg pandan roundabout.
CLIENT : MMC GAMUDA KVMRT (UGW) JV

5,275,000.00
3

Project Mass Rapid Transit Lembah Kelang – Jajran Sungai Buloh – Kajang
The construction and completion of temporary road diversion and other accosiated works(Phase 1) for Subway & Entrance at Bukit Bintang Underground Station

829,644.10
4

Project Mass Rapid Transit Lembah Kelang – Jajran Sungai Buloh – Kajang
Bill 1 : heavy Lifting Crane Foundation For IVS2

100,862.00
No Title Amount
1

Menyiapkan baki kerja bagi projek membina jalan baru dari lebuhraya seremban-pd-fr5 di pasir panjang dan menaiktaraf fr5 dari pasir panjang ke linggi, negeri, Sembilan (seksyen 1)
Package B
CLIENT : HARTAJAYA-BENTENG TIMUR-AMR JELI JV SDN BHD

7,600,000.00
2

The construction, completion, testing commissioning and maintenance of the infrastructure works N5 – ROB 5- Earthwork, backfilling, pavement and associated works – JLN ALMA
CLIENT : MMC GAGUDA JOIN VENTURE

7,500,314.49
3

The construction, completion, testing commissioning and maintenance of the infrastructure works N5 – ROB 5- Earthwork, backfilling, pavement and associated works – JLN ALMA
CLIENT : MMC GAGUDA JOIN VENTURE

7,500,314.49
4

Office Interior renovation work at Asian Football Confederation (AFC). Bukit Jalil, Kuala Lumpur
CLIENT: Asian Football Confederation

7,500,000.00
5

Office Interior renovation work at Asian Football Confederation (AFC). Bukit Jalil, Kuala Lumpur
CLIENT: Asian Football Confederation

7,500,000.00
6

Electrified Double Tracking Project Between Ipoh and Padang Besar Contract No: KP/KTM/17/2007
The construction and completion of pavement works for package N5 sub package S18 (ROB 5 – Jalan Alma)
CLIENT : MMC GAGUDA JOIN VENTURE

3,539,513.16
7

Menyiapkan baki kerja bagi projek membina jalan baru dari lebuhraya seremban-pd-fr5 di pasir panjang dan menaiktaraf fr5 dari pasir panjang ke linggi, negeri, Sembilan (seksyen 1)
Package A1
CLIENT : HARTAJAYA-BENTENG TIMUR-AMR JELI JV SDN BHD

2,673,377.84
8

Kementerian Pertahanan Malaysia
Kerja-kerja membuka, membaiki dan mengati semula kemasan dinding, lantai dan siling dan kerja-kerja berkaitan
CLIENT : CALL TIMES ENGINEERING SDN BHD

2,369,190.00
9

Kementerian Pertahanan Malaysia
Kerja-kerja membuka, membaiki dan mengati semula kemasan dinding, lantai dan siling dan kerja-kerja berkaitan
CLIENT : CALL TIMES ENGINEERING SDN BHD

2,369,190.00
10

Project Mass Rapid Transit Lembah Kelang – Jajaran Sungai Buloh – Kajang
The construction and completion of Drainage works, temporary road and traffic diversion at Maluri Station and Crossover (STge 3 and 4)
CLIENT : GAMUD ENGGINEERING SDN BHD

1,560,303.28
11

Project Mass Rapid Transit Lembah Kelang – Jajaran Sungai Buloh – Kajang
The construction and completion of Surface Water Drainage and Road Diversion (Stage 3) for Buki Bintang Station
CLIENT : MMC GAMUDA KVMRT (UGW) JV

897,587.80
12

Electrified Project Mass Rapid Transit Lembah Kelang – Jajaran Sungai Buloh – Kajang
The construction and completion of temporary road and traffic diversion at Maluri Station & portal
CLIENT : MMC GAMUDA KVMRT (T) SDN BHD

770,000.00
13

Electrified Double Track Project Between Seremban and Gemas – Package 1 – Subcontract Works : SC/EDT/2011/82:
Drainage Works for ROB 6
CLIENT : IJM-NORWEST JOINT VENTURE

690,000.00
14

Electrified Double Track Project Between Seremban and Gemas – Package 1 – Subcontract Works : SC/EDT/2011/82:
Drainage Works for ROB 6
CLIENT : IJM-NORWEST JOINT VENTURE

690,000.00
15

Project Mass Rapid Transit Lembah Kelan – Jajaran Sungai Buloh – Kajang
The construction and completion of site Facilities, drainage works & ancillary works at Escape Shaft3
CLIENT:MMC GAMUDA KVRT (T) SDN BHD

571,967.20
16

Project Mass Rapid Transit Lembah Kelang – Jajran Sungai Buloh – Kajang
The Construction and completion of Temporary Road ,Traffic Diversion and site facilities works includin tree removal,drainage works and reinforced concrete slab at pasar Seni station
CLIENT:MMC GAMUDA KVRT (UGW) JV

544,055.50
17

Project Mass Rapid Transit Lembah Kelan – Jajaran Sungai Buloh – Kajang
The construction and completion of site Facilities, drainage works & ancillary works at Intervention Shaft 2, jln Bukit Bintage
CLIENT:MMC GAMUDA KVRT (T) SDN BHD

514,785.00
18

Electrified Double Track
Earthwork and resurfacing work at Jalan Harapan, Bukit, Mertajam, Pennag
CLIENT : MMC GAGUDA JOIN VENTURE

467,114.70
19

Electrified Double Track
Earthwork and resurfacing work at Jalan Harapan, Bukit, Mertajam, Pennag
CLIENT : MMC GAGUDA JOIN VENTURE

467,114.70
20

Project Mass Rapid Transit Lembah Kelang – Jajran Sungai Buloh – Kajang
The Construction and completion of 2 number of muck pits at Inai Launch Shaft
CLIENT:MMC GAMUDA KVRT (UGW) JV

347,957.25
21

Project Mass Rapid Transit Lembah Kelang – Jajran Sungai Buloh – Kajang
The Construction and completion of Temporary Road ,Traffic Diversion at pasar Seni Station and Constuction of RC Flood Wall
CLIENT:MMC GAMUDA KVRT (T) SDN BHD

331,717.80
22

Electrified Double Track Project-Ipoh To Padan Besar Construction and completion of earthwork for detention pond at Bukit Tengah ard S16(N5)
CLIENT:MMC GAMUDA JOINT VENTURE

330,085.66
23

Project Mass Rapid Transit Lembah Kelang – Jajran Sungai Buloh – Kajang
installation of Ring beam for Escape Shaft ES3 to North & South Bound(2 tunnel)
CLIENT:MMC GAMUDA KVRT (UGW) JV

273,172.00
24

Project Mass Rapid Transit Lembah Kelang – Jajran Sungai Buloh – Kajang
The Construction and completion of Temporary platform,drainage works and toilet facilities for Escape Shaft 3, Kampung Pandan
CLIENT:MMC GAMUDA KVRT (T) SDN BHD

270,000.00
25

Project Mass Rapid Transit Lembah Kelan – Jajaran Sungai Buloh – Kajang
Pasar Seni Traffic diversion and misc work(Stage 1-4)
CLIENT:MMC GAMUDA KVRT (T) SDN BHD

139,682.87
26

Project Mass Rapid Transit Lembah Kelan – Jajaran Sungai Buloh – Kajang
The construction Temporary works & ancillary works at Sg. Kerayong
CLIENT:MMC GAMUDA KVRT (T) SDN BHD

110,073.00
27

Project Mass Rapid Transit Lembah Kelang – Jajran Sungai Buloh – Kajang
Advance Works along Jalan hang Jebat for Utility Relocation work at Merdeka Station (Subway Entrance A)
CLIENT:MMC GAMUDA KVRT (T) SDN BHD

92,474.90
28

Electrified Double Track Project-Ipoh To Padan Besar Construction and completion of Bukit Tengah detention pond inlet and outlet box culvert at S16(N5)
CLIENT:MMC GAMUDA JOINT VENTURE

89,982.20
29 Electrified Double Track
landscape worker at jalan permatang pauh butterworth,mak mandin ,Penang
CLIENT:MMC GAMUDA JOINT VENTURE
No Title Amount
None